Skip to content

Industrial sourcing · Engineering procurement

Engineering procurement without borders.

We source, supply and support the industrial products and engineering requirements behind heavy industry — from a single bearing to a fully documented project package.

Search by model, brand or part number — or browse the catalogue.

Explore Products
Industrial process plant at dusk
  • ISO 9001 aligned quality process
  • Authorised distribution channels
  • Full material traceability on request
  • Source inspection before dispatch
Countries supplied
40+
Product references
12,000+
Qualified suppliers
260+
On-time delivery
98.4%

Catalogue

Start from a category.

Every category page carries the specification detail needed to select correctly, and everything is quoted against your duty, quantity and destination.

Product categories

Engineered categories, specified properly.

All categories
Bearings — industrial supply

Precision bearings for industrial applications, from standard deep groove units to spherical roller sets.

141 products

Electrical Components — industrial supply

Contactors, breakers, drives and control gear for industrial power and control panels.

0 products

Hydraulic Pumps — industrial supply

Industrial hydraulic pumps from leading manufacturers, specified for pressure, displacement and duty cycle.

0 products

Capabilities

More than products. Complete industrial support.

All services
03

Manufacturing

Made-to-print components through a qualified manufacturing base.

06

Logistics

Consolidated freight, documentation and delivery to site.

Sectors

Built for demanding industries.

All industries
Energy sector

Energy

Generation, transmission and renewables equipment.

Featured products

Specified, stocked and supported.

Pricing is quoted per requirement rather than published, because configuration, quantity and destination all move it.

Browse catalogue

Delivered work

Measured against the date that mattered.

All case studies
Energy2023

Second-source qualification removed a single-supplier dependency

A qualified second source was in place within four months, lead time on the component returned to eight weeks, and the original supplier improved terms once dependency was removed.

To qualified second source
4 months
Lead time recovered
18 → 8 wks
Suppliers audited on site
2

Next step

Tell us what you need. We will tell you how to get it.

Send a specification, a drawing, a part number or a photograph of a nameplate. Our engineering team will come back with options, pricing and a realistic delivery date.

Talk to engineering

We typically respond within one business day.